Call nowFree estimate
Design inspiration of a bright kitchen with a dark island, white cabinets, and wood flooring
The heart of the home

Kitchen Remodeling

Kitchen floors, backsplashes, and the clearances around them, planned before the old surface comes up.

Completed projects include a 1-year warranty that starts at project completion.

Design inspiration, not a completed JRF project

Surfaces

Floors, backsplashes, and the gaps between cabinets

A kitchen remodel here is about the surfaces you walk on and look at, and the order they have to happen in. Cabinet and appliance heights have to be known before the first cut.

FloorsPorcelain tile and a rated luxury vinyl plank are the workhorses. Engineered wood can belong if the product allows a kitchen and you accept that a sink leak becomes a repair. Laminate is a weak kitchen floor.
BacksplashesCeramic and porcelain, including a handmade-look field that still needs a straight line. Outlets and window sills are part of the layout.
DoorwaysThe kitchen has to meet the dining room, the pantry, and the garage step. Those heights are measured before material is ordered.
What is only in the job if it is writtenNew cabinets, plumbing moves, and electrical are included when the proposal says so. A floor and a backsplash are a real project. A full gut is a different one.
Good fits

Kitchens that have outgrown the surface

The layout can stay and the project can still be worth doing. The floor and the splash are enough when they are planned with the appliances.

Layout staying, floor leavingAppliances come out, the old floor comes up, the new one goes under the range and the dishwasher, and the toe kicks go back.
Floor and splash togetherGrout color and floor color are chosen in the same daylight, which is the daylight you cook in.
A heavier remodelA new run of base cabinets needs a floor level enough for them. That scope is written wall by wall.
WaitAn active leak under the sink comes first. Finishes go in after the water has stopped.
Sequence

Clearances before the finish picks

A thicker floor can make a door drag or a dishwasher refuse to slide back. We measure those exits before demo.

Measure the exitsEvery doorway, the slider, the step to the garage, and the thickness of the floor that is there now.
DemoRooms that are staying finished get protected. The old floor and the old splash come out. The subfloor is repaired where a dishwasher or an ice maker has been wet.
Order of installSubfloor, then flooring if it must run under cabinets, then cabinets if they are in scope, then the backsplash, then appliances, then shoe and thresholds.
WalkthroughDoors, dishwasher clearance, grout, and reducers. Run the dishwasher once while we are still the people to call.
Care

A kitchen floor is a cleaning floor

The back door and the bar stools will write the history of this floor. Plan for them.

The garage entryGrit from that door sands a vinyl wear layer and scratches a wood finish. A mat belongs there.
The dishwasherPull it at the first drip. The new floor is not waterproofing for a leaking appliance.
StoolsFelt on the island stools the week they come back. They are the fastest wear pattern in the room.
The splashWipe it. Food left in a grout joint becomes a stain.
Kitchen questions

Staying, appliances, and cabinets that are not moving

The proposal should answer these before demo day.

Can we stay in the house?+

With one kitchen, you will be without that sink and that range while the floor or the splash is in cure. We will name those days after the scope is known. A second kitchen changes the answer.

Do you pull the appliances?+

Yes, when the floor runs under them, which it should. Gas and water are reconnected as the scope describes. If a line has to move, that is written before demo.

What if the cabinets are staying?+

The floor usually stops at a clean line under the toe kick, or the kick comes off and the floor tucks under. Tucking looks better and takes more care at the dishwasher and the corners. The proposal says which one.

Which floor belongs in a kitchen with dogs?+

Porcelain, or a rigid vinyl plank with a thick wear layer. Both still show grit if it is never swept. Wood is the choice when you want wood and you will live with the scratches a water bowl and a dog door imply.

Tell us whether the cabinets are staying.

That one fact changes the floor, the splash, and the order of the work.

Completed projects include a 1-year warranty that starts at project completion.

Request a free estimate