Call nowFree estimate
Design inspiration of a commercial lobby with large-format stone tile, a reception desk, and a dark accent wall
Commercial services

Commercial Interiors

Floors and finishes for restrooms, lobbies, and other working rooms, scheduled around the hours the space can actually close.

Completed projects include a 1-year warranty that starts at project completion.

Design inspiration, not a completed JRF project

Commercial

Floors that get cleaned every night

Commercial work is planned around traffic, cleaning, and the hours the space can actually be empty. The materials have a spec sheet and a way to be repaired in a section.

Porcelain and ceramicLobbies, restrooms, and anywhere water and grit meet. Slip resistance matters more than the veining. Wall tile in a restroom is a different spec from the floor.
Resilient floorsSheet vinyl or vinyl plank where the room wants a continuous, cleanable surface. Seams are the craft. A seam in the path of a cart wheel collects dirt.
Carpet tileFor offices that need a module replaced under a desk. Broadloom is a weaker choice where one stain should not mean a new room.
Feature wallsStone or tile at a reception wall, planned so the pattern meets the desk and the corners without a sliver.
Spaces

Rooms that stay open, or that only close at night

If the use is a forklift on a warehouse slab, say so. The product changes. The work below is for customer rooms and working interiors, not industrial slabs.

RestroomsFloors, walls, vanities, and a return to service the business can schedule. This is a large part of the commercial work we have finished.
Lobbies and entriesA hard floor, a walk-off that is long enough to matter, and a feature wall that can be cleaned.
Offices and light retailFloors that tolerate a nightly mop and a dolly. Rolling chairs need a product rated for them.
Occupied buildingsSuites with elevator rules, hour limits, and a path that has to stay protected. The building's rules are part of the scope.
The work

Hours, protection, and attic stock

A floor the night crew cannot clean with their actual chemicals is the wrong floor, however it looked on a board.

Site walkHours, freight elevator, the existing floor, and what the cleaning crew uses. Access and alarms are part of the first conversation.
Spec and layoutTile layout for a restroom, a seam plan for a resilient floor, and leftover material so a later scar can be patched from the same run.
The windowNights, or a closed section, with debris out before the space reopens. Dust in a clinic or a restaurant is not a small thing.
HandoffWalk the space with the person who will live with it. Leftover material is labeled and left where it can be found.
Care

Tell the night crew what the floor is

Most commercial floor complaints after a good install are the cleaner, the grit, and a patch from the wrong tile.

ChemicalsNeutral cleaners on grout and on vinyl. A stripper left over from an old waxed floor can haze a new resilient surface.
Walk-offA real mat at the entry saves the lobby. Parking-lot grit is the wear.
PatchesUse the attic stock. A close-enough tile from a retail shelf will show in a straight grout line.
RestroomsThe same dry-down habit as a house, plus a look at caulk joints on the schedule the facility already keeps.
Commercial questions

Hours, lobbies, and buildings with rules

We do not publish a generic number of days. The room and the hours it can close decide that.

Can the work happen after hours?+

When the business needs that, the schedule is built around it. Access, alarms, and the time the space must be walkable in the morning are part of the first conversation.

What floor belongs in a lobby?+

A porcelain rated for the traffic, with a surface that is not slick when it rains, and a walk-off long enough to catch grit. Polished stone is a maintenance program, not only a material.

Do you work in occupied high-rises?+

Yes, with the building's rules. Protection, elevator pads, and the hours they allow are planned before material is delivered.

Can one restroom stay open?+

On a site with more than one, usually. A single restroom means the business needs a plan for the days it is closed. We will talk through that after we see the room.

Tell us the hours the space can close.

A restroom, a lobby, or a suite is enough to start, along with the building's access rules.

Completed projects include a 1-year warranty that starts at project completion.

Request a free estimate