Call nowFree estimate
Coordinated transformation

Remodeling

Kitchens, baths, and connected rooms where the flooring, tile, and fixtures have to be sequenced as one project.

Completed projects include a 1-year warranty that starts at project completion.

Rooms

Kitchens, baths, and the rooms that connect them

Remodeling at JRF is the work that has to be sequenced with the surfaces: flooring, tile, trim, and the fixtures those surfaces meet.

KitchensFloors, backsplashes, and the finish work that has to land in the right order around cabinets and appliances.
BathroomsWaterproofing, tile, vanities, and the glass and plumbing the tile has to meet.
Whole-home sequencesOne material story through rooms that connect, phased so you can still live there when that is the plan.
The floor inside the remodelHeights, transitions, and what a dishwasher or a shower curb needs are decided with the remodel, not after it.
Good fits

More than a new surface

If the only task is a single fixture and the surround is sound, we will say the project is smaller than a remodel.

A bath that has to be openedSoft subfloor, a leaking shower, a layout that does not work. Tile on top of the problem wastes the tile.
A kitchen where the surfaces have to agreeEspecially when cabinets are staying and the floor has to finish at the toe kick, or when cabinets are going and the floor should run underneath.
Several rooms at onceA hall, a kitchen, and a living room that share doorways. Planned together, they read as one house.
A single room is still a projectA hall bath does not need a whole-home plan. It does need a path protected and a height that meets the floor outside the door.
Sequence

Scope, demolition, then finishes in order

The proposal is the list of what is included, what is not, and which decisions have to be made before demolition.

The visitWe look at what is working, what is wet, and what you want to keep. Measurements and photos beat a guess.
Decisions before demoTile, flooring, and the vanity or the cabinet plan have to be chosen before the old surfaces come out. Changing them mid-job is how heights stop lining up.
The orderDemo, substrate, the rough work the scope assigns, then tile and flooring, then trim and fixtures, then a clean and a walkthrough.
The closeYou and JRF walk the finished rooms. Remaining items get a list.
The first week

New finishes want ordinary patience

Cure times are part of the handoff, in plain language, for the products actually used.

Grout and caulkLet them cure. A new shower does not get a hard scrub the first morning.
New floorsA wood floor inside a remodel follows the same cure rules as a flooring-only job. Rugs wait.
Run the waterUse the bath and look. A slow weep at a curb is easier to address before the towels are back.
DustWe clean the work area. A phased whole-home job includes which rooms stay shut.
Remodeling questions

One room, or the rooms that touch it

The first conversation is about what has to open up, and what can stay.

Can you remodel one bathroom and leave the house alone?+

Yes. A hall bath is a complete project. We protect the path out of that room and we do not expand the scope unless the floor outside the door has to change height to meet the new tile.

Do you coordinate plumbers and electricians?+

When those trades are part of the agreed scope, they are scheduled with the tile and the finishes. When you are hiring them, we need their timing before waterproofing starts. Either way it is written down.

Can the flooring be part of the same project?+

Yes. It is measured with the rest of the rooms and written into the same proposal, including the transitions at each doorway.

How do we start?+

Send the rooms, the city, and a few photos, or call. The in-home visit is how the scope becomes specific.

Start with the room that is failing.

A leaking shower, a soft kitchen floor, or a hall that touches every doorway is enough to begin.

Completed projects include a 1-year warranty that starts at project completion.

Request a free estimate