Call nowFree estimate
Design inspiration of a calm bathroom with large-format tile, a glass shower, and a freestanding tub
Private retreat

Bathroom Remodeling

Bathrooms rebuilt from the waterproofing outward, so the tile and the fixtures have a sound wall and a sloped floor to land on.

Completed projects include a 1-year warranty that starts at project completion.

Design inspiration, not a completed JRF project

The bath

Waterproofing, tile, and the fixtures they meet

A bathroom remodel is a wet assembly first and a finish second. The tile, the vanity, and the glass are only as good as the slope, the waterproofing, and the flatness under them.

Shower wallsPorcelain or ceramic over a waterproofed substrate, with a niche and a finished edge at the ceiling or the paint line. Large panels look quiet and show every lip. Smaller tile is more forgiving of a wall that is a little out of plumb, and it is still not an excuse to skip prep.
Shower floorsA mosaic or another small format that can follow the slope to a center drain or a linear drain. The drain is chosen before the tile, because it sets the slope.
The bath floorPorcelain that can get wet, with a transition at the door that meets the hall carpet or wood on purpose.
Where the tile stopsA wainscot, a painted wall above the tile, and the casing at the door are part of the finished room.
Good fits

Baths that need to be opened

Paint and a new faucet are not a remodel. Soft wood, a failed pan, and a layout that fights the room are.

A primary bathNew tile, a sound pan or a tiled shower floor, glass, and a vanity wall plumb enough to tile.
A small hall bathThe same assembly in a tighter room. Centered cuts matter more when the room is five feet wide.
A tub that is stayingTile can be redone around a sound tub. If the apron is soft, the tub is part of the conversation before tile is ordered.
A powder roomOften a floor and a small splash, not a full waterproofed shower. Smaller scope, still a real layout.
Sequence

From the wet side out

Demo is when the scope sometimes grows. We stop and tell you before extra work starts.

Open the wallsThe old surround comes out. Soft subfloor and soft studs get replaced before any board or membrane goes up.
Waterproofing and slopeWalls and the pan area are waterproofed as a system. The floor slopes to the drain. Grout is not what keeps water out of the wall.
TileThe niche, the curb, the bench if there is one, and the centerline are set so cuts land in the corners. Then the field, then the floor, then grout.
Glass, fixtures, walkthroughGlass is measured after the tile unless the system is a known kit. The vanity and the toilet go back. We look at joints, caulk, and the door transition in the light you use.
Care

Cure it, then keep the water on the tile

The first week is patience. After that it is squeegees, caulk, and the mat.

The waitNo shower until the grout and caulk have cured for the products used. We leave that wait in writing.
Glass and wallsA squeegee keeps the film down. Hard water in parts of the metro spots glass no matter who set the tile.
Caulk versus groutChanges of plane get caulk, not grout. Caulk that fails years later is maintenance. Grout cracked across a field is a reason to call, because it can mean movement.
The matA bath mat that stays soaked will stain grout and swell a wood threshold outside the room.
Bath questions

Walls, fixtures, and the days the room is closed

A one-bath house needs a plan for those days. We talk about it before the toilet comes out.

What has to happen before tile goes on a shower wall?+

The wall has to be sound, flat enough for the tile you chose, and waterproofed. Loose backer and a missed corner at the curb are the usual reasons a new shower leaks into an old problem.

Can the fixtures stay where they are?+

Often that is the right plan. Keeping the toilet, sink, and shower in place avoids plumbing moves and still lets the tile and the vanity be new. If a fixture has to move, it is in the proposal before demo.

How long is the bath out of service?+

Through demo, waterproofing, tile, and cure. A house with a second bath can live with that. A one-bath house needs a plan, and we set that expectation from the visit rather than publish a generic number of days.

Does the old tile leave the property?+

When replacement is the scope, the old tile comes out and leaves with the job. It is heavy, and the haul is listed so it is not an afterthought.

Start with the shower that is failing.

Photos of the curb, the niche, and the floor outside the door tell us a lot before the visit.

Completed projects include a 1-year warranty that starts at project completion.

Request a free estimate